Three Resinex elastic beacons were positioned by the Clodia company in order to signal the breakwater placed outside the mouth of the Chioggia port in the Venice lagune. The opera was part of the Mose project which also foresees, for Chioggia, a mobile dam system against high water.
The three Resinex elastic beacons represent the solution to a tricky problem which is to signal the presence and extension of the outer dam, some 500 metres long, which in the past, due to inadequate signalling, created navigational problems. They were placed in 10-metre deep water and are fitted with a top mark.